Hexylene Glycol Production By Catalytic Chemical Reaction

Report Cover

Hexylene Glycol Production Cost Breakup By Catalytic Chemical Reaction

This study analyzes Hexylene Glycol Production By Catalytic Chemical Reaction, covering manufacturing, process flow, operating expenses, and financial considerations.

Last Updated: January, 2025

Request Sample
Udeesha Tomar profile photo
Written ByUdeesha Tomar

This report entails the detailed cost evaluation of hexylene glycol production by catalytic chemical reaction. The synthesis of hexylene glycol is initiated by the chemical reaction between diacetone alcohol and hydrogen in the presence of a catalyst. The process begins with the condensation of acetone in the presence of a base catalyst, such as barium hydroxide, to give diacetone alcohol as a product. It is further hydrogenated with hydrogen in the presence of an achiral reagent and yields hexylene glycol as the final product.

Top Producers of Hexylene Glycol

  • BASF
  • Solvay
  • Arkem Group
  • Lonza Group
  • FINAR

Feedstocks for Hexylene Glycol

Hexylene glycol is prepared by using diacetone alcohol, hydrogen, and achiral reagents as some of its major feedstocks. The procurement of hexylene glycol and its feedstocks is determined by several factors. Some of the major factors include the availability of the raw material (acetone, hydrogen, and more), activities in the upstream market, maintenance of stability in the supply chain, and demand from its downstream industries (including chemical, cosmetics, pharmaceutical, etc.). Moreover, the trading activities, logistics, along with trade and governmental policies altogether play a vital role in governing its procurement on a large scale.

The project economic analysis provided in the report discusses a Germany-based plant:

  • Manufacturing Process
    • Process Flow
    • Material Flow
    • Material Balance
  • Raw Material and Product's Specifications
    • Raw Material Consumption
    • Product and Co-Product Generation
    • Capital Investment
  • Land and Site Cost
    • Offsites/Civil Works
    • Equipment Cost
    • Auxiliary Equipment Cost
    • Contingency
    • Engineering and Consulting Charges
    • Working Capital
  • Variable Cost
    • Raw Material
    • Utilities
  • Fixed Cost
    • Labor Requirement & Wages
    • Overhead Expenses
    • Maintenance Charges
  • Financing Costs
    • Interest on Working Capital
    • Interest on Loans
  • Depreciation Charges
  • General Sales and Admin Costs
  • Production Cost Summary

Choose What's Right for You

Basic
$2499.00
Premium
$3499.00$3149.00
10% OFF
Enterprise
$4799.00$4079.00
15% OFF
View Full Comparison

Pay Via

Mastercard
Wire
VISA
Stripe

About the Author

Udeesha Tomar profile photo

Udeesha Tomar

AVP - Strategy and Solutions

Leading procurement research solutions across chemicals, materials, and food & beverages, with expertise in price forecasting and market analytics.

Compare & Choose the Right Report Version for You

MasterCardwireVisastripe

Basic

$2499.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format
Most Popular
10% OFF

Premium

$3499.00

$3149.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format
15% OFF

Enterprise

$4799.00

$4079.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format

Our customized rigorous reports help you decide on:

Team working

Multi-Regional Cost Analyses

Compare plant and operation costs across regions with a consistent layout for standardized benchmarks for global expansion frameworks.

Feasibility Studies

Validate project viability with pre-built technical templates and financial assumptions calibrated to your industry.

Investment Analyses

Prioritise projects with side-by-side capital, return, and risk metrics aligned to your internal investment thresholds.

Techno-Economic Evaluations

Link process engineering data with fullchain economics to understand margins, breakeven points, and sensitivities.

How to Order Your Report?