This report entails the detailed cost evaluation of Itraconazole production from bromomethyl dichlorophenyl dioxalane benzoate, and 1H-1,2,4 triazole. The manufacturing process of itraconazole involves several stages. In the first stage, bromomethyl dichlorophenyl dioxalane benzoate, and 1H-1,2,4 triazole are combined in a reactor, followed by sodium hydroxide solution.
The mixture is heated for 8 hours, then cooled and potassium carbonate is added. After stirring and filtering, the solvent dimethyl formamide is distilled off, and water and toluene are added to the remaining mixture. The organic layer is washed and dried to produce a specific compound. In the subsequent stages, additional reactions are carried out to produce intermediate compounds. Finally, in the last stage, itraconazole is obtained, which is purified using solvents and carbon.
Top Manufacturers of Itraconazole
- Tianjin Lisheng Pharmaceutical
- Le Pu Pharmaceutical
- Honz Pharmaceutical
- Macleods
- anssen Pharmaceutica
- Mylan
Feedstock for Itraconazole
The major feedstock for itraconazole involves the compounds bromomethyl dichlorophenyl dioxalane benzoate, and 1H-1,2,4 triazole, along with other chemicals such as toluene and other compounds. The availability and cost of raw materials such as phenol, chloroform and formaldehyde are necessary for the manufacturing of dichlorophenyl dioxalane benzoate.
The price, demand, and cost fluctuations of these feedstocks chiefly govern the procurement of itraconazole. Moreover, maintaining a reliable and stable source is essential for pharmaceutical industries. Technological advancements influencing costs and improving efficacy further influence the procurement of itraconazole. Additionally, factors such as regulatory compliance and global economic conditions also play a role in shaping the procurement of itraconazole around the world.
The project economic analysis provided in the report discusses a Germany-based plant:
- Manufacturing Process
- Process Flow
- Material Flow
- Material Balance
- Raw Material and Product's Specifications
- Raw Material Consumption
- Product and Co-Product Generation
- Capital Investment
- Land and Site Cost
- Offsites/Civil Works
- Equipment Cost
- Auxiliary Equipment Cost
- Contingency
- Engineering and Consulting Charges
- Working Capital
- Variable Cost
- Fixed Cost
- Labor Requirement & Wages
- Overhead Expenses
- Maintenance Charges
- Financing Costs
- Interest on Working Capital
- Interest on Loans
- Depreciation Charges
- General Sales and Admin Costs
- Production Cost Summary