This report contains a broad cost evaluation of PVD Salt via brine tank. Making a salt solution by flooding it with water is the first step in the procedure. The insoluble materials in the flooded brine are pumped out to a brine clarifier, where they settle to the bottom and are removed, leaving a clear brine solution that is then sent to a brine tank. In order to separate the magnesium and calcium salts present in addition to the salt in the brine tank, the necessary chemicals (like Sodium Hydroxide, Sodium Carbonate, Calcium Hydroxide) are added.

Following filtration, the brine is transferred to the last brine tank. From this tank, saturated brine is delivered to a continuous evaporation system, where it crystallises and is piped as slurry into a concentrate tank. After that, a hydro-cyclone battery is used to concentrate the salt slurry to a maximum of 50–60%.

This slurry is placed into a centrifuge, which produces salt cakes with 4-5% moisture. A smooth conveyor feeds the salt, which contains 4-5% moisture, to a fluid bed drier, where the iodisation is finished. The salt is fluidized by warm and ambient air in the Vibro fluid bed dryer before being dried and cooled. After that, a sieve machine receives the salt through a bucket elevator. The extra-large particles are gathered and transferred to the brine tank for ultimate re-dissolution.

The project economic analysis provided in the report discusses a Germany-based plant:

  • Manufacturing Process
    • Process Flow
    • Material Flow
    • Material Balance
  • Raw Material and Product's Specifications
    • Raw Material Consumption
    • Product and Co-Product Generation
    • Capital Investment
  • Land and Site Cost
    • Offsites/Civil Works
    • Equipment Cost
    • Auxiliary Equipment Cost
    • Contingency
    • Engineering and Consulting Charges
    • Working Capital
  • Variable Cost
    • Raw Material
    • Utilities
  • Fixed Cost
    • Labor Requirement & Wages
    • Overhead Expenses
    • Maintenance Charges
  • Financing Costs
    • Interest on Working Capital
    • Interest on Loans
  • Depreciation Charges
  • General Sales and Admin Costs
  • Production Cost Summary

Choose What's Right for You

Basic
$2499.00
Premium
$3499.00$3149.00
10% OFF
Enterprise
$4799.00$4079.00
15% OFF
View Full Comparison

Pay Via

Mastercard
Wire
VISA
Stripe

About the Author

Udeesha Tomar profile photo

Udeesha Tomar

AVP - Strategy and Solutions

Leading procurement research solutions across chemicals, materials, and food & beverages, with expertise in price forecasting and market analytics.

Compare & Choose the Right Report Version for You

MasterCardwireVisastripe

Basic

$2499.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format
Most Popular
10% OFF

Premium

$3499.00

$3149.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format
15% OFF

Enterprise

$4799.00

$4079.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format

Our customized rigorous reports help you decide on:

Team working

Multi-Regional Cost Analyses

Compare plant and operation costs across regions with a consistent layout for standardized benchmarks for global expansion frameworks.

Feasibility Studies

Validate project viability with pre-built technical templates and financial assumptions calibrated to your industry.

Investment Analyses

Prioritise projects with side-by-side capital, return, and risk metrics aligned to your internal investment thresholds.

Techno-Economic Evaluations

Link process engineering data with fullchain economics to understand margins, breakeven points, and sensitivities.

How to Order Your Report?