Tin Plate Production from Strip Mill

  • Report Summary
  • Optional Analyses & Support

Analysis Basis : Germany

Period of Analysis : Q3 2019

Delivered in PDF Format

This report provides the cost structure of tinplate by strip mill process. In this process, the hot rolled steel sheets are pickled in acid to remove the iron oxide layer formed. It is then sent to the rolling mill to achieve the desired thickness. Finally, the product is coated with a layer of tin by electroplating. The product either remains in a roll or is cut into rectangular sheets.

 

The project economic analysis provided in the report discusses a Germany-based plant and encorporates:

 

  • Manufacturing Process
    • Process Flow
    • Material Flow
    • Material Balance
  • Raw Material and Product/s Specifications
    • Raw Material Consumption
    • Product and Co-Product Generation
    • Capital Investment
  • Land and Site Cost
    • Offsites/Civil Works
    • Equipment Cost
    • Auxiliary Equipment Cost
    • Contingency
    • Engineering and Consulting Charges
    • Working Capital
  • Variable Cost
    • Raw Material
    • Utilities
  • Fixed Cost
    • Labor Requirement & Wages
    • Overhead Expenses
    • Maintenance Charges
  • Financing Costs
    • Interest on Working Capital
    • Interest on Loans
  • Depreciation Charges
  • General Sales and Admin Costs
  • Production Cost Summary

Optional Analyses & Support

Additional Analyses and support that complement your report- Just click on the checkboxes below and add them to your shopping cart. Click on the  icons for descriptions and samples.

Capital Investment Details

Production Cost Details

Economics for Another Plant Location    

Dynamic Cost Model

Support

 

Purchase Options



$ 1199.00
Buy Now  
Online Preview

Why Choose Procurement Resource

  • Up-to-date economic analyses
  • Independent assessments
  • Reliable Information
  • Trusted by leading companies

Evaluate Other Plant Locations

This report presents an analysis of capital and operating costs of a -based industrial plant. For those interested in economic assessments considering other plant locations, Procurement Resource offers optional analyses that complement this report.

;