Product Overview

The report provides a detailed analysis essential for establishing a Cilengitide production plant. It encompasses all critical aspects necessary for Cilengitide production, including the cost of Cilengitide production, Cilengitide plant cost, Cilengitide production costs, and the overall Cilengitide production plant cost. Additionally, the study covers specific expenditures associated with setting up and operating a Cilengitide production plant. These encompass production processes, raw material requirements, utility requirements, infrastructure needs, machinery and technology requirements, manpower requirements, packaging requirements, transportation requirements, and more.

Cilengitide is a synthetic small peptide drug that is used to block specific integrin proteins found on the surface of cancer cells and blood vessel cells that supply tumours. It helps cancer cells stick to surrounding tissues, form new blood vessels (angiogenesis), and spread to other parts of the body. It cuts off the blood supply that tumours need to grow and survive, which slows down disease progression and can trigger tumour cell death. It is also employed for the treatment of glioblastoma multiforme, where it is used in combination with radiation and chemotherapy for better results. It also shows benefits in treating other cancers like lung, prostate, head and neck, and skin cancers, as well as some blood cancers, because of its dual ability to prevent tumour growth and limit metastasis.

The market for Cilengitide is driven by the demand for better cancer treatments for aggressive tumours like glioblastoma. Its usage for fighting cancer by blocking integrins, proteins that help cancer cells grow and form blood vessels, boosts its market. Its utilisation in combination with cancer therapies and research into other diseases like lung, skin, and head and neck cancers makes it a preferred drug. The industrial Cilengitide procurement is affected by complex peptide synthesis that needs special raw materials and equipment, resulting in low yields and long production times. Also, the presence of only a few research-grade suppliers, along with supply risks like shipping delays, quality control issues, and higher costs, impacts its sourcing.

Raw Material for Cilengitide Production

According to the Cilengitide production plant project report, the key raw materials used in the production of Cilengitide include Fmoc-protected amino acids and Wang Resin.

Production Process of Cilengitide

The extensive Cilengitide production cost report consists of the following major industrial production process:

  1. From Fmoc-protected amino acids and Wang Resin: The production of Cilengitide is done by a process called solid-phase peptide synthesis. The peptide chain is built one amino acid at a time on a solid resin. Protected amino acids are added in sequence, forming the desired linear chain. After the last amino acid is attached, protective groups are removed, and the peptide is cleaved from the resin using a solution of trifluoroacetic acid (TFA). The linear peptide is then cyclised, and its ends are joined to form a stable ring structure using either a chemical or enzyme-catalysed reaction. Finally, the product is purified using high-performance liquid chromatography (HPLC) and dried to get pure Cilengitide.

Cilengitide has the molecular formula of C27H40N8O7 and a molecular weight of 588.66 g/mol. It is a white to off-white lyophilised powder. It is a cyclic RGD pentapeptide (cyclo(RGDf-NMeVal)) with high hydrophilicity and a logP value of -2.5 and a topological polar surface area of 238 Ų. It has 7 hydrogen bond donors, 8 acceptors, and 4 defined stereocenters. It shows good water solubility with a density of around 1.42 g/cm³. It forms mixed hydrate-solvate crystals with alcohols like methanol and ethanol, showing pseudopolymorphism. It is stable as a solid at -20 degree Celsius and is administered intravenously in clinical formulations.

Cilengitide Production Cost Report

Cilengitide Production Cost Reports

Choose What's Right for You

Basic
$2499.00
Premium
$3499.00$3149.00
10% OFF
Enterprise
$4799.00$4079.00
15% OFF
View Full Comparison

Pay Via

Mastercard
Wire
VISA
Stripe

Product Details

Descriptive alt text

Product Details

Particulars Details
Product Name Cilengitide
Scope Production Process: Process Flow, Material Flow, Material Balance

Raw Material and Product Specifications: Raw Material Consumption, Product and Co-product Generation

Land and Site Cost: Offsites/Civil Works, Equipment Cost, Auxiliary Equipment Costs, Contingency, Engineering and Consulting Charges, Working Capital

Variable Cost: Raw Material, Utilities, Other Variable Costs

Fixed Cost: Labor Requirements and Wages, Overhead Expenses, Maintenance Charges, Other Fixed Costs

Financing Costs: Interest on Working Capital, Interest on Loans

Other Costs: Depreciation Charges, General Sales and Admin Cost
Currency US$ (Data can also be provided in the local currency)
Pricing and Purchase Options Basic: US$ 2499
Premium: US$ 3499
Enterprise: US$ 4799
Customization Scope The report can be customized as per the requirement of the customer
Post-Sale Analysts Report 10-12 weeks of post-purchase analyst support after report delivery for any queries from the deliverable
Delivery Format PDF and Excel format through email (editable version in PPT/Word format of the report can be also provided on special request)

How does our Cilengitide Production Cost Report Provide Exhaustive Data and Extensive Insights?

At Procurement Resource, we not only focus on optimizing the should cost of production for Cilengitide but also provide our clients with extensive intel and rigorous information on every aspect of the production process. By utilizing a comprehensive cost model, we help you break down expenses related to raw materials, labor, and technology, offering clear pathways to savings. We also assist in evaluating the capital expenditure (CAPEX) and operating expenses (OPEX), which are often measured as cost per unit of production, such as USD/MT, ensuring that your financial planning is aligned with industry benchmarks.

We offer valuable insights on the top technology providers, in-depth supplier database, and best manufacturers, helping you make informed decisions to improve efficiency. Additionally, we design the most feasible layout for your production needs, ensuring the entire process runs smoothly. By minimizing the cash cost of production, we ensure that you stay competitive while securing long-term profitability in the growing Cilengitide market. Partnering with Procurement Resource guarantees that every aspect of your production is cost-efficient, advanced, and tailored to your specific requirements.

Key Questions Answered in This Report:

  • What are the key requirements for setting up a Cilengitide production plant?
  • How is Cilengitide manufactured?
  • What is the process flow involved in producing Cilengitide?
  • What are the raw material requirements and costs for producing Cilengitide?
  • What is the total size of land required for setting up a Cilengitide production plant?
  • What are the construction requirements for setting up a Cilengitide production plant?
  • What are the machinery requirements for producing Cilengitide?
  • What are the utility requirements and costs for producing Cilengitide?
  • What are the manpower requirements for producing Cilengitide?
  • What are the average salaries/wages of manpower working in a Cilengitide production plant?
  • What are the packaging requirements and associated costs for Cilengitide?
  • What are the transportation requirements and associated costs for Cilengitide?
  • What are the capital costs for setting up a Cilengitide production plant?
  • What are the operating costs for setting up a Cilengitide production plant?
  • What should be the price of Cilengitide?
  • What will be the income and expenditures for a Cilengitide production plant?

Need more help?

  • Get plant-level economics customised to your capacity, technology route, location shortlist, financing assumptions, and expansion plans.
  • We offer interactive Excel cost models and dashboards so you can test scenarios on feedstock, utilities, prices, and margins in seconds.
  • Work directly with expert Procurement Resource analysts for insights on recent market trends, technology shifts, best practices, key risks, pricing, margins, ROI, and relevant standards and regulations.
  • Strengthen your competitive position by using these insights to optimise operations, sharpen sourcing strategies, and maximise profitability.
  • For further assistance, share your requirements with our analysts using the options below, and we will quickly come back with tailored solutions and recommended next steps.
call center

Still Need Help ?

+1 307 363 1045Or[email protected]

Compare & Choose the Right Report Version for You

MasterCardwireVisastripe

Basic

$2499.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format
Most Popular
10% OFF

Premium

$3499.00

$3149.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format
15% OFF

Enterprise

$4799.00

$4079.00

BUY NOW
  • Executive Summary
  • Key Process Information
  • Variable Cost Breakdown
  • Conversion Cost Analysis
  • Capital Investment Analysis
  • Land and Site Cost Details
  • Construction Cost Breakdown
  • Equipment Cost Breakdown
  • Techno-Economic Parameters
  • Delivery Format

How to Order Your Report?